Inventory Costing
Lecture on inventory and material costing.
00:48Learning outcomes: what inventories are and why systems matter03:13Key features of an inventory system05:01Why hold inventory: independence of operations06:34Flexibility in production scheduling07:46Economic purchase orders and discounts09:50Inventory costs: ordering cost11:09Set-up costs (e.g. switching car models)12:41Stock-out costs (e.g. a phone launch)14:03Objectives of stock control17:04Stock levels19:34Reorder level formula20:53Minimum stock level (buffer stock)24:01Maximum stock level25:42Worked example: stock levels27:14EOQ: minimising total cost28:31Holding cost per unit per year29:58FIFO valuation31:37Example: FIFO and weighted average cost (WAC)41:16FIFO in inflation: higher profit and stock value42:39WAC smooths out price changes44:21Summary: FIFO vs WAC1Inventory & LKAS 2
Inventory is the raw materials, work-in-progress and finished goods that are the part of a business's assets ready, or that will be ready, for sale.
LKAS 2 objective: prescribe the accounting for inventories:
- determining cost
- recognising the expense, including any write-down to NRV
- the cost formulas used
Inventories are stated at the LOWER of cost and net realisable value (NRV).
What goes into the cost of inventory
| Include | Exclude |
|---|---|
| Purchase costs: price + non-refundable taxes, transport and handling, net of trade discounts and subsidies | Abnormal waste |
| Conversion costs: direct labour + fixed and variable production overheads | Storage costs |
| Other costs to bring inventory to its present location and condition | Administrative overheads not related to production |
| Selling costs | |
| Foreign-exchange differences on recent foreign-currency purchases | |
| Interest on deferred-settlement purchases |
Purchase-cost layout:
| Rs | |
|---|---|
| Purchase price | xxxx |
| Less: trade discounts | (xxx) |
| Less: subsidies | (xxx) |
| Carriage inwards | xxxx |
| Direct taxes | xxxx |
| Non-refundable taxes | xxxx |
| Other direct costs | xxxx |
| Total purchase cost | xxxx |
Net realisable value
- Write-downs to NRV are an expense in the period they happen. Reversals are recognised in the income statement when they happen.
- NRV can be compared item by item (the item method) or by groups of similar items (the batch method).
- Cost formulas for interchangeable items: FIFO or weighted average (LIFO is not allowed).
- Expense recognition: when inventory is sold, its carrying amount becomes cost of goods sold. Write-downs and losses are expensed when they occur.
| Item | Cost | NRV | Value used |
|---|---|---|---|
| A | 1,000 | 1,300 | 1,000 |
| B | 800 | 650 | 650 |
| C | 500 | 500 | 500 |
| Item-by-item total | 2,150 |
Comparing the totals instead (cost 2,300 vs NRV 2,450) would give 2,300. That hides B's loss, which is why the item method is preferred.
2Function 1: managing purchases
Centralised vs decentralised buying
| Centralised buying | Decentralised buying | |
|---|---|---|
| Advantages | Consistent buying policy · better control · expert buying staff · avoids excess stock | Lower transport cost · rejections, shortages and excess receipts settled quickly · local purchase benefits (low or seasonal prices) |
| Disadvantages | Less flexible · high initial cost · high transport cost | High stock-holding cost |
The purchase procedure
- Purchase requisition (when?)
- Determine quantity (how much?)
- Select supplier (where?)
- Purchase order & follow-up
- Receive & inspect (GRN)
- Check invoice & pass for payment
| Step | Details |
|---|---|
| 1. Purchase requisition (PR) | Request to buy, usually in triplicate: to purchasing, to production control, and kept by the initiating department |
| 2. Quantity | In line with production and sales plans. Optimum quantity, no overstocking (EOQ) |
| 3. Supplier | Inquiries and tenders or quotations → analyse tenders → select the best source |
| 4. Purchase order | A large firm may make 5 copies: supplier, receiving department, accounts, the requisitioning department, and one kept by purchasing |
| 5. Receive and inspect | Unload, unpack, mark; check quality and quantity; move into the factory. Prepare the goods received note (GRN), the basis of entries in the stores ledger |
| 6. Invoice | Check against the PO and GRN, then pass for payment |
Material cost
Invoice price + freight + excise duty + non-returnable containers (as LKAS 2's purchase cost).
- Cash discount is a financial item, not deducted from material cost.
- Returnable containers: only the net cost (charge − credit on return) is included.
- Quotation: 2,000 units @ Rs 5.00; 4,000 @ Rs 4.75; 6,000 @ Rs 4.00
- Trade discount 25%; cash discount 5% within 10 days
- Freight Rs 200 per order
- Containers Rs 0.50 each, one per 100 units, credit Rs 0.30 each if returned within two months
| Rs | |
|---|---|
| 6,000 × Rs 4.00 | 24,000 |
| Less: trade discount 25% | (6,000) |
| 18,000 | |
| Freight | 200 |
| Containers: 60 × 0.50 = 30, less credit 60 × 0.30 = 18 → net | 12 |
| Total material cost | 18,212 |
| Cost per unit = 18,212 ÷ 6,000 | ≈ Rs 3.035 |
The cash discount is ignored: it's a financing decision, not a cost of the material.
3Function 2: storing materials & stock levels
Why efficient storing?
- keep stores in proper custody
- protect them from theft, deterioration, evaporation, pilferage
- maintain a smooth, regular flow to production
Store locations: centralised, decentralised, or a combination.
| Centralised stores: advantages | Disadvantages |
|---|---|
| Better layout, less equipment, better supervision, economy in cost, better stock forecasting | High transport cost, greater fire risk, delays to production |
Stock control levels
| Level | Formula | Meaning |
|---|---|---|
| Re-order level (ROL) | Max consumption × max lead time (or min stock + avg consumption × avg lead time) | When the storekeeper raises a purchase requisition |
| Maximum stock level | ROL + ROQ − (min consumption × min lead time) | Stock shouldn't rise above this (avoids blocking capital) |
| Minimum stock level (safety or buffer stock) | ROL − (avg consumption × avg lead time) | Stock shouldn't fall below this |
| Average stock level | (Max + Min) ÷ 2, or Min + ½ ROQ |
- ROQ = 36,000 units
- Lead time 2–4 months (average 3)
- Max consumption 9,000 per month; normal consumption 6,000 per month
- Assume minimum consumption = 2 × 6,000 − 9,000 = 3,000, since normal is the average of max and min
| Level | Working | Units |
|---|---|---|
| Re-order level | 9,000 × 4 | 36,000 |
| Minimum level | 36,000 − (6,000 × 3) | 18,000 |
| Maximum level | 36,000 + 36,000 − (3,000 × 2) | 66,000 |
| Average level | (66,000 + 18,000) ÷ 2 | 42,000 (or 18,000 + ½ × 36,000 = 36,000) |
Economic order quantity (EOQ)
D = annual demand · Co = cost of placing one order · Ch = holding cost per unit per year
EOQ assumptions:
- perfectly forecastable, even demand
- constant lead time
- constant material price
- constant holding cost per unit
- Monthly usage 250, so D = 3,000 a year
- Co = Rs 30
- Unit cost Rs 5, holding cost 10%, so Ch = Rs 0.50
EOQ = √(2 × 3,000 × 30 ÷ 0.5) = √360,000 = 600 units
4Function 3: pricing material issues — FIFO & weighted average
| Method | Idea | Effect when prices rise |
|---|---|---|
| FIFO (first in, first out) | Issues are priced at the oldest batches first | Issues at older (lower) prices, so closing stock is at the latest (higher) prices and profit is higher |
| Weighted average cost (WAC) | After each receipt, compute average = total value ÷ total units; issue at that average | Smooths price changes |
- 1 Jan: balance 200 @ Rs 500
- 10 Jan: purchased 300 @ Rs 600
- 15 Jan: issued 250
- 20 Jan: purchased 100 @ Rs 650
- 24 Jan: issued 175
FIFO
| Date | Issue | Issue value | Balance |
|---|---|---|---|
| 15 Jan | 200 @ 500 + 50 @ 600 | 130,000 | 250 @ 600 = 150,000 |
| 20 Jan | (receipt) | 250 @ 600 + 100 @ 650 = 215,000 | |
| 24 Jan | 175 @ 600 | 105,000 | 75 @ 600 + 100 @ 650 = 110,000 |
Weighted average (perpetual)
| Date | Working | Issue value | Balance |
|---|---|---|---|
| 10 Jan | (100,000 + 180,000) ÷ 500 = Rs 560 | 500 @ 560 = 280,000 | |
| 15 Jan | 250 @ 560 | 140,000 | 250 @ 560 = 140,000 |
| 20 Jan | (140,000 + 65,000) ÷ 350 = Rs 585.71 | 350 = 205,000 | |
| 24 Jan | 175 @ 585.71 | 102,500 | 175 = 102,500 |
One per line: R qty price for a receipt, I qty for an issue. The first line can be the opening balance as a receipt.
Expect:
- LKAS 2: lower of cost and NRV; what's included in and excluded from cost; FIFO and WAC allowed
- Material cost calculations (trade discount, freight, net container cost; ignore cash discount)
- Centralised vs decentralised buying and stores
- The purchase procedure and its documents (PR, PO, GRN)
- ROL, maximum, minimum and average levels
- EOQ with its assumptions
- The stores ledger using FIFO and WAC
5Practice questions (course paper)
| Rs. | |
|---|---|
| Purchase price 300,000 − trade discount 10% | 270,000 |
| Carriage inwards | 50,000 |
| Import tax | 20,000 |
| Clearing charges | 15,000 |
| Non-recoverable VAT: 60% × 10,000 | 6,000 |
| Cost | 361,000 |
| Item | Cost | Selling price | Selling cost | NRV | Value at (lower of cost and NRV) |
|---|---|---|---|---|---|
| A | 100 | 120 | 30 | 90 | 90 |
| B | 120 | 150 | 20 | 130 | 120 |
| C | 300 | 305 | 15 | 290 | 290 |
| Batch | Item | Cost | NRV | Units | Item method (lower × units) |
|---|---|---|---|---|---|
| Soap | Lux | 35 | 30 | 200 | 6,000 |
| Soap | Rani | 40 | 41 | 150 | 6,000 |
| Toothpaste | Signal | 120 | 110 | 100 | 11,000 |
| Toothpaste | Supiriwiki | 100 | 95 | 60 | 5,700 |
| 28,700 |
Batch method:
- Soap: cost 13,000 vs NRV 12,150 → 12,150
- Toothpaste: cost 18,000 vs NRV 16,700 → 16,700
- Total 28,850
The table columns are jumbled in the PDF; this is the reading that fits them.
| Q | Answer | Why |
|---|---|---|
| 4 | (d) all of the above | Maximum, minimum and re-order levels all guide requisitioning |
| 5 | (b) re-order level | Safety stock depends on consumption, lead time and stock-out cost, not on the ROL |
| 6 | (c) EOQ | It balances ordering and holding costs |
| 7 | (b) 2,100 | ROL = max usage × max lead time = 700 × 3 |
| 8 | (a) LIFO | Issues are charged at the latest (higher) prices. LKAS 2 doesn't allow LIFO in financial statements, but it's the textbook answer |
Opening 545 @ 35. Receipts: 444 @ 37.50 (Jan) · 500 @ 40 (Feb) · 750 @ 42 (Mar). Issues: 400 · 610 · 450.
| Issue | FIFO | WAC (rate) |
|---|---|---|
| Jan 400 | 400 @ 35 = 14,000 | @ 36.12 = 14,448.94 |
| Feb 610 | 145 @ 35 + 444 @ 37.50 + 21 @ 40 = 22,565 | @ 37.90 = 23,120.66 |
| Mar 450 | 450 @ 40 = 18,000 | @ 40.40 = 18,181.39 |
| Closing 779 units | 29 @ 40 + 750 @ 42 = 32,660 | 31,474.01 |
If a physical count differs from the card, adjust the card to the count, and write off the shortage at the issue rate as a material loss.
Q10 (Swarnahansa):
- EOQ = √(2 × 600 × 80 / 0.60) = 400 units
- Orders a year = 600 / 400 = 1.5
- Minimum yearly cost = 1.5 × 80 + (400 / 2) × 0.60 = 120 + 120 = Rs. 240
- Supply period = 12 / 1.5 = 8 months
Q11 (Sachin Ltd): annual usage 1,200; carrying cost = 25% × 4 quarters × 40 = Rs. 40 per unit per year.
- EOQ = √(2 × 1,200 × 600 / 40) ≈ 190 units
- Orders ≈ 6.3 a year
Q12 (product X): annual usage 60 × 52 = 3,120.
| Measure | Formula | Answer |
|---|---|---|
| Re-order quantity (EOQ) | √(2 × 3,120 × 120 / 12) | ≈ 250 |
| Re-order level | max usage × max lead time = 90 × 6 | 540 |
| Minimum level | ROL − normal usage × normal lead time = 540 − 60 × 5 | 240 |
| Maximum level | ROL + ROQ − min usage × min lead time = 540 + 250 − 30 × 4 | 670 |
| Average level | (min + max) / 2 | 455 |
Q13 to Q15: annual usage 250 × 12 = 3,000.
- Q13: EOQ = √(2 × 3,000 × 30 / 0.5) = 600 (c)
- Q14: orders = 3,000 / 600 = 5 (a)
- Q15: time between orders = 12 / 5 = 2.4 months (c)
6Quick revision sheet
| Concept | Remember it as |
|---|---|
| Inventory | Raw materials, WIP, finished goods |
| LKAS 2 rule | Lower of cost and NRV |
| Cost | Purchase + conversion + other costs (location and condition) |
| Excluded | Abnormal waste, storage, admin, selling, FX, deferred interest |
| NRV | Selling price − completion costs − selling costs |
| Formulas | FIFO or weighted average (no LIFO) |
| Buying | Centralised (control, expertise) vs decentralised (local, quick) |
| Documents | Purchase requisition → purchase order → GRN → invoice |
| Material cost | Price − trade discount + freight + net containers (6,000 units = 18,212) |
| ROL | Max use × max lead time (36,000) |
| Min | ROL − avg use × avg lead time (18,000) |
| Max | ROL + ROQ − min use × min lead time |
| EOQ | √(2DCo/Ch) = 600 |
| FIFO / WAC example | Issues 130,000 + 105,000 vs 140,000 + 102,500 |
?Self-check quiz