Overhead Costing — Allocation, Apportionment, Re-apportionment & Absorption
What overheads are and how they're classified, cost centres, allocation vs apportionment and the bases used, re-apportioning service departments (direct, step-down, reciprocal), overhead absorption rates (actual vs predetermined, six methods, blanket vs departmental), and under/over absorption.
▶Lecture videos
Click any timestamp — here or inside the notes — to jump the video to that moment. Your position is remembered.
Overhead Costing
A complete worked example through a biscuit manufacturer: allocation → apportionment → re-apportionment → absorption → under/over absorption.
00:02Introduction and colour code of the slides01:43What overhead is: direct vs indirect cost (biscuit example)03:42Classification: indirect material, labour, expenses; production, selling, admin05:41Step 1: allocation to cost centres (departments)07:09Allocation example: Depts A, B and maintenance10:18Step 2: apportionment on a fair basis12:32Apportionment example: electricity, rent, insurance, depreciation17:35Department totals after primary apportionment18:14Step 3: re-apportioning service departments20:22Maintenance shared 3:2 by maintenance hours21:17Step 4: absorption into products23:52Labour-intensive vs machine-intensive bases25:46Dept A: 267,800 ÷ 4,000 labour hours = Rs 66.95/hour26:55Dept B: 324,200 ÷ 2,000 machine hours28:19Predetermined (budgeted) rates29:03Over- and under-absorption1What is overhead?
Overhead is the total of indirect materials, indirect labour and indirect expenses: costs incurred in making a product, providing a service or running a department that can't be traced directly and in full to the product 01:43.
- Direct: we can measure the flour and the labour hours per packet of biscuits.
- Indirect (overhead): we can't say how much electricity, water, or the production manager's salary went into one packet.
| Classification by element 03:42 | Classification by function |
|---|---|
| Indirect materials (cleaning materials, lubricants) | Production overhead: factory electricity |
| Indirect labour (supervisors, storekeepers) | Selling and distribution overhead: showroom electricity |
| Indirect expenses (rent, insurance, depreciation) | Administration overhead: HR building electricity |
Overheads can't be traced to a unit directly, so they reach each unit through three stages:
- Allocation
- Apportionment (+ re-apportionment of service depts)
- Absorption into units
2Cost centres, allocation & apportionment
A cost centre is a responsibility centre whose manager is accountable for the expenses under their control. In simple terms, a department 06:05.
Cost centres can be production, service or process cost centres.
| Allocation | Apportionment | |
|---|---|---|
| Meaning | Whole cost items charged directly to one cost centre | Sharing a common cost in proportions between two or more cost centres on a fair basis |
| Example | Each department has its own electricity meter. Food colouring used only by Dept A (Rs 15,000) | One electricity bill or the factory rent shared by floor area |
Bases of apportionment
| Overhead | Basis |
|---|---|
| Rent, rates and taxes, lighting and heating, building insurance, depreciation and repairs, air conditioning | Floor area occupied |
| Insurance and depreciation of plant and machinery | Capital value (of machines) |
| Repairs and maintenance of plant and machinery | Machine hours |
| Welfare, time-keeping, payroll office, canteen, recreation, supervision, medical | Number of employees |
| Store-keeping expenses | Value or weight of materials (or number of requisitions) |
| Transport service | Truck mileage, tonnage, truck hours, number of packages |
| Electricity (power) | Kilowatt usage (or floor area) 11:51 |
- Electricity Rs 225,000 by kW usage 500 : 400 : 100 = 5 : 4 : 1 (A : B : maintenance): A = 225,000 ÷ 10 × 5 = 112,500, B = 90,000, maintenance = 22,500 15:01.
- Rent Rs 150,000 by floor area 2,500 : 3,750 : 1,250 m² = 2 : 3 : 1: A = 150,000 ÷ 6 × 2 = 50,000, B = 75,000, maintenance = 25,000 16:01.
- Machine insurance Rs 45,000 by machine value 300k : 500k : 100k = 3 : 5 : 1: A 15,000, B 25,000, maintenance 5,000 17:08.
- Machine depreciation Rs 72,000, also 3 : 5 : 1: A 24,000, B 40,000, maintenance 8,000.
Adding the directly allocated items (A 15,000 · B 60,000 · maintenance 25,000), the primary totals are A 216,500 · B 290,000 · maintenance 85,500 17:35.
Re-apportionment: maintenance 85,500 by maintenance hours 3,000 : 2,000 (3 : 2) gives A +51,300 and B +34,200. Final: A 267,800 · B 324,200 19:28.
3Re-apportioning service department costs
- Production departments carry out the central purpose of the organisation.
- Service departments (stores, maintenance, canteen, personnel, accounting) support them and have no output of their own.
- So their costs must be re-apportioned to production departments before absorption 18:14.
| Service cost centre | Re-apportionment basis |
|---|---|
| Stores | Number (or value) of material requisitions |
| Maintenance | Hours of maintenance work for each centre |
| Purchasing | Number of purchase orders, or value of materials purchased |
| Inspection | Inspection hours |
| Internal transport | Weight and distance |
Three methods:
| Method | When |
|---|---|
| 1. Direct method | Ignore services between service departments. Apportion each service department straight to production departments |
| 2. Step-down method | Some service departments serve others, but the services aren't reciprocated. Apportion one service department, including its share to the others, then the next |
| 3. Reciprocal method | Service departments serve each other. Use repeated distribution or simultaneous equations (let S = stores total, M = maintenance total…) |
| Prod A | Prod B | Stores | Maintenance | |
|---|---|---|---|---|
| Overheads | 10,030 | 8,970 | 10,000 | 8,000 |
| Material requisitions (Rs) | 30,000 | 50,000 | – | – |
| Maintenance hours | 8,000 | 1,000 | – | – |
- Stores (10,000) by requisitions 30 : 50: A = 10,000 × 3/8 = 3,750, B = 6,250
- Maintenance (8,000) by hours 8,000 : 1,000: A = 8,000 × 8/9 = 7,111, B = 889
| Prod A | Prod B | |
|---|---|---|
| Own overheads | 10,030 | 8,970 |
| From stores | 3,750 | 6,250 |
| From maintenance | 7,111 | 889 |
| Total | 20,891 | 16,109 |
Check: 20,891 + 16,109 = 37,000, the total of all four departments.
4Overhead absorption
Absorption is the systematic process of charging the overheads of production departments to the units produced, using an overhead absorption rate (OAR) 21:44.
Predetermined OAR = Budgeted overheads ÷ Budgeted activity ← normally used
Why predetermined? Actual figures are only known at the end of the period. Product costs are needed now, for pricing, planning and control 28:19.
Methods of absorption
| Method | OAR formula | Best for |
|---|---|---|
| Production unit | POH ÷ number of units | Identical products (every biscuit packet is the same) 24:27 |
| % of direct labour cost | POH ÷ direct labour cost × 100 | |
| % of direct material cost | POH ÷ direct material cost × 100 | |
| % of prime cost | POH ÷ prime cost × 100 | |
| Direct labour hour rate | POH ÷ labour hours | Labour-intensive departments 23:52 |
| Machine hour rate | POH ÷ machine hours | Machine-intensive departments |
- Blanket (single) rate: one rate for the whole factory. Simple, but inaccurate when departments differ.
- Departmental rates: a separate OAR for each production department. More accurate.
5Under- and over-absorption
Absorbed overhead = predetermined OAR × actual activity. Compare it with actual overhead:
| Result | Meaning | Treatment |
|---|---|---|
| Over-absorption | Absorbed > actual: costs were overstated 29:03 | Credit to the P&L (adds to profit) |
| Under-absorption | Absorbed < actual: costs were understated 29:24 | Debit to the P&L (an extra expense) |
Causes:
- actual overheads differ from budget
- actual activity differs from budget
- both
Defaults reproduce the video's biscuit company (A 267,800 → Rs 66.95/hr; B 324,200 → Rs 162.10/hr). Edit any figure. A and B are production departments; S is the maintenance service department.
A typical question is a full overhead analysis sheet:
- Allocate direct items.
- Apportion shared costs with the right bases (state them).
- Re-apportion the service departments (direct, step-down or reciprocal).
- Compute departmental OARs (labour hour vs machine hour, and say why).
- Cost a unit or job.
- Work out the under/over absorption.
Also define allocation vs apportionment and explain why predetermined rates are used.
6Practice questions (course paper)
| Expense (basis) | X | Y | A | B | Total |
|---|---|---|---|---|---|
| Depreciation (asset value 10:5:3:1) | 100,000 | 50,000 | 30,000 | 10,000 | 190,000 |
| Rent, rates, taxes (floor space 5:4:1:2) | 15,000 | 12,000 | 3,000 | 6,000 | 36,000 |
| Insurance (asset value) | 8,000 | 4,000 | 2,400 | 800 | 15,200 |
| Power (machine hours 10:5:4:1) | 10,000 | 5,000 | 4,000 | 1,000 | 20,000 |
| Canteen (workers 100:50:50:25) | 4,800 | 2,400 | 2,400 | 1,200 | 10,800 |
| Electricity (light points 50:30:20:20) | 2,000 | 1,200 | 800 | 800 | 4,800 |
| Primary total | 139,800 | 74,600 | 42,600 | 19,800 | 276,800 |
| A to X : Y = 3 : 2 | 25,560 | 17,040 | (42,600) | ||
| B to X : Y = 9 : 1 | 17,820 | 1,980 | (19,800) | ||
| Production overheads | 183,180 | 93,620 | — | — | 276,800 |
The tables in Q2 are too jumbled in the PDF to read reliably, so there's no answer for Q2 here; use the method from Q1 and Q3. Q6 is reconstructed below; check its data against your own copy of the paper.
Overheads: 1 = 5,000 · 2 = 8,000 · 3 = 15,000 · A = 1,000 · B = 4,000 (total 33,000).
Simultaneous equations:
- A = 1,000 + 0.2B
- B = 4,000 + 0.1A
- So A = 1,836.73 and B = 4,183.67
| 1 | 2 | 3 | |
|---|---|---|---|
| Own overheads | 5,000 | 8,000 | 15,000 |
| Share of A (30% / 50% / 10%) | 551.02 | 918.37 | 183.67 |
| Share of B (40% / 30% / 10%) | 1,673.47 | 1,255.10 | 418.37 |
| Total | 7,224.49 | 10,173.47 | 15,602.04 |
Repeated distribution reaches the same totals: keep sharing A and B out until the amounts left are negligible.
The paper says "two production and three service departments", but its apportionment table treats 1, 2 and 3 as production and A and B as service.
Q4: direct material = 4.5 kg × Rs. 2 = 9, direct labour = 6 h × Rs. 1 = 6, prime cost 15 per unit. Overheads are 3,000 for 2,000 units.
| Basis | Rate | Overhead per unit | Cost per unit |
|---|---|---|---|
| Production units | 3,000 / 2,000 = 1.50 per unit | 1.50 | 16.50 |
| % of direct wages | 3,000 / 12,000 = 25% | 1.50 | 16.50 |
| % of direct material | 3,000 / 18,000 = 16.67% | 1.50 | 16.50 |
| % of prime cost | 3,000 / 30,000 = 10% | 1.50 | 16.50 |
| Direct labour hours | 3,000 / 12,000 h = 0.25 per hour | 1.50 | 16.50 |
| Machine hours | 3,000 / 4,000 h = 0.75 per hour | 1.50 | 16.50 |
All six give the same answer, because there's only one product and every base is proportional to output.
Q5: direct material 10 × 5 = 50, direct labour 8 × 4 = 32 (prime 82). Overhead 10,000 / 1,000 units = 10 per unit on every basis (machine hour rate 2.50 × 4 hours). Cost = 92.
Data read from the damaged table:
- Floor space: 2,000 / 2,500 / 3,000 / 2,000 / 500
- Light points: 10 / 15 / 20 / 10 / 5
- Direct wages: 3,000 / 2,000 / 3,000 / 1,500 / 500
- HP: 60 / 30 / 50 / 10 / 0
- Machinery value: 60,000 / 80,000 / 100,000 / 5,000 / 5,000
- Working hours: A 6,226, B 4,028, C 4,066
| A | B | C | D | E | |
|---|---|---|---|---|---|
| Primary totals | 7,550 | 7,200 | 9,650 | 3,125 | 1,075 |
Simultaneous equations: D = 3,125 + 0.1E and E = 1,075 + 0.1D, so D = 3,265.15 and E = 1,401.52.
| A | B | C | |
|---|---|---|---|
| Final overheads | 8,763.64 | 8,459.85 | 11,376.52 |
| Rate per hour | 1.408 | 2.100 | 2.798 |
| Hours used by the article | 4 | 5 | 3 |
| Overhead | 5.63 | 10.50 | 8.39 |
Total cost = 50 + 30 + 24.53 = Rs. 104.53
7Quick revision sheet
| Concept | Remember it as |
|---|---|
| Overhead | Indirect material + indirect labour + indirect expenses |
| Function classes | Production · selling & distribution · administration |
| Cost centre | Department; production, service or process |
| Allocation | Whole cost to one centre |
| Apportionment | Share on a fair basis (floor area, capital value, employees, machine hours, kW) |
| Re-apportionment | Service → production: direct · step-down · reciprocal (repeated distribution, equations) |
| Direct-method example | A 20,891 · B 16,109 (total 37,000) |
| Absorption | Charge to units with an OAR |
| OAR | Budgeted OH ÷ budgeted activity (predetermined) |
| Methods | Unit · % labour, material or prime cost · labour hour · machine hour |
| Blanket vs departmental | One rate vs one per department (more accurate) |
| Video example | 267,800 ÷ 4,000 = 66.95/hr; × 2 hrs = 133.90 per unit |
| Over-absorbed | Absorbed > actual → credit P&L |
| Under-absorbed | Absorbed < actual → debit P&L |
?Self-check quiz
12 questions on this week. Answer them all, then press Check my answers. Your best and latest scores are saved and shown on the subject page.