Standard Costing & Variance Analysis

Standard cost vs budgeted cost, setting material, labour and overhead standards, the four types of standards, the standard cost card (Rs 134 example), the variance tree with every formula (material, labour, variable and fixed overhead, sales), a full worked variance example, and the advantages and limitations.

ITE36221 video · 28 min📄 Standard costing and variance analysis session 15.pdf📄 Practice – Standard costing & variance.pdf

1Standard cost & standard costing

Definitions
  • Standard cost: a predetermined (planned) estimated unit cost of a product, component or service, used for stock valuation and control 04:21. It's what a unit should cost under efficient operating conditions.
  • Standard costing: a control technique that compares standard costs and revenues with actual results to obtain variances, which are used to stimulate improved performance 03:08.
The carpenter 02:16

A carpenter targets Rs 15,000 per chair, but the actual cost is Rs 18,000. That's a Rs 3,000 adverse variance. He investigates why and controls that cost next time. This is the core idea of standard costing.

Standard costing involves:

  1. Set standards
  1. Ascertain actual results
  1. Compare → variances
  1. Investigate & take action

Uses of standard costs:

  • cost control
  • performance evaluation
  • stock valuation
  • setting selling prices 05:31

Standard vs budget

Standard Budget
Unit Per unit of product or activity Total activity or operation
Example 07:51 Rs 3 per unit 10,000 units × 3 = Rs 30,000

Similarities:

  • both are forecasts about the future
  • both are control tools

They're interrelated: budget = standard × budgeted activity.

2Setting standards

Two approaches 08:51:

  1. Historical records: use past experience of materials, labour and overhead per unit. It's simple.
  2. Engineering studies: a technical study of the input–output relationship. It's more complex but more precise.
Component Quantity standard Price or rate standard
Direct material Bill of materials (BOM) per product, allowing for unavoidable waste (avoidable waste is not allowed) 11:44 Purchasing department: contracts, supplier discussions, forecast price movements
Direct labour Standard hours for an average worker to do the job Contractual wage rate 13:37
Overheads Standard hours (absorption base) Standard overhead absorption rate. Fixed overheads don't vary in the short run, but are absorbed per unit for financial reporting and inventory valuation 14:55

3Types of standards

Type Based on Effect
Ideal Perfect conditions: no waste, spoilage, inefficiency, idle time or breakdowns 17:15 Unattainable, so it demotivates
Attainable Allows for normal waste and inefficiency; realistic but challenging 18:29 Best for motivation ✓
Current Current conditions, including current waste and inefficiency 19:15 Doesn't try to improve efficiency
Basic Old standards, never changed 19:45 Least useful; mainly for showing long-term trends

4Standard cost card

The standard cost card shows the full details of the standard cost of each product, one card per product. It's confidential: for top management decision-making only 20:20.

Product A standard cost card 21:01
Element Standard quantity Standard price or rate Rs per unit
Direct material 2 kg Rs 10 per kg 20
Direct labour 3 hours Rs 24 per hour 72
Variable overhead 3 hours Rs 8 per hour 24
Fixed overhead 3 hours Rs 6 per hour 18
Standard cost per unit 134

5The variance tree

Total profit variance Sales variance Production cost variance Non-production cost Selling pricevariance Sales volumevariance DM total DL total VOH total FOH total Marketing Admin Price(AQ) Usage(SP) Rate(AH) Efficiency(SR) Expenditure+ Efficiency Expenditure+ Volume

A = adverse (actual cost > standard, or actual revenue < standard): reduces profit.

F = favourable: increases profit.

6Variance formulas

DIRECT MATERIAL
Price variance = (AQ × AP) − (AQ × SP) = Actual cost − Standard cost of actual quantity
Usage variance = (AQ − SQ) × SP (SQ = standard quantity for the actual output)
DIRECT LABOUR
Rate variance = (AH × AR) − (AH × SR)
Efficiency variance = (AH − SH) × SR (SH = standard hours for actual output)
VARIABLE OVERHEAD
Expenditure variance = Actual VOH − (AH × standard VOH rate)
Efficiency variance = (AH − SH) × standard VOH rate
FIXED OVERHEAD
Total variance = Actual FOH − Absorbed FOH (actual output × FOAR)
Expenditure variance = Actual FOH − Budgeted FOH
Volume variance = Absorbed − Budgeted = (Actual output − Budgeted output) × FOAR per unit
SALES
Selling price variance = (Actual price − Standard price) × Actual units sold
Sales volume variance = (Actual units − Budgeted units) × standard profit per unit (absorption costing) or × standard contribution per unit (marginal costing)
Sign check

For costs, actual > standard is adverse. For revenue and volume, actual > standard is favourable. The two sub-variances always add up to the total.

Worked variance example (built on the product A card)

Data:

  • Budget: 1,000 units; budgeted fixed overhead Rs 18,000 (FOAR Rs 18 per unit); standard price Rs 180 (standard profit 180 − 134 = Rs 46).
  • Actual:
  • produced and sold 1,100 units at Rs 175
  • materials 2,300 kg costing Rs 24,150
  • labour 3,200 hours costing Rs 78,400
  • overheads: VOH Rs 26,000; FOH Rs 19,500

Standards for the actual output:

  • SQ = 1,100 × 2 = 2,200 kg
  • SH = 1,100 × 3 = 3,300 hours
Variance Working Rs
DM price 24,150 − 2,300 × 10 1,150 A
DM usage (2,300 − 2,200) × 10 1,000 A
DL rate 78,400 − 3,200 × 24 1,600 A
DL efficiency (3,200 − 3,300) × 24 2,400 F
VOH expenditure 26,000 − 3,200 × 8 400 A
VOH efficiency (3,200 − 3,300) × 8 800 F
FOH expenditure 19,500 − 18,000 1,500 A
FOH volume (1,100 − 1,000) × 18 1,800 F
FOH total (check) 19,500 − 1,100 × 18 = 19,500 − 19,800 300 F ✓
Selling price (175 − 180) × 1,100 5,500 A
Sales volume (1,100 − 1,000) × 46 4,600 F

Interpretation:

  • Workers were efficient: fewer hours than standard.
  • But they were paid a higher rate, and materials cost more and more were used. Did cheaper, poor-quality material slow anything? Here it didn't, but investigate the interdependence.
  • Selling more units at a lower price gave a net Rs 900 adverse sales effect.
🧪 Try it — Variance analyser

Standards (from the cost card). Edit any value.

Actuals

7Advantages & limitations

Advantages 22:24 Limitations 25:17
Predicts future costs for decision-making Too much emphasis on direct labour; modern production is capital-intensive
Gives employees a target, which motivates them Needs repetitive operations and homogeneous output, so it's unsuited to non-standardised or customised production
Evaluates managerial performance Hard to apply in service organisations
Helps set budgets (standard × activity) Built for stable environments; standards go out of date as prices change
Acts as a control device: management by exception Assumes performance to standard is acceptable, which conflicts with continuous improvement
Simplifies costing for profit measurement and inventory valuation Assigning responsibility for variances is difficult (they're interdependent)
Reporting delay: variances arrive late
Behavioural issues: unattainable standards demotivate; blame culture
Exam focus

Expect:

  1. Define standard cost and standard costing.
  2. Standard vs budget.
  3. How standards are set, for material, labour and overhead.
  4. The four types of standards, and why attainable is preferred.
  5. Prepare a standard cost card.
  6. Calculate and interpret variances. Always label A or F, and use SQ and SH for actual output.
  7. Advantages and limitations.

8Practice questions (course paper)

Q1: Material variances (10,000 bags of cement)

Standard quantity: limestone 11 kg × 10,000 = 110 tons; sand 26 kg × 10,000 = 260 tons.

Variance Limestone Sand Total
Price: (SP − AP) × AQ (70 − 75) × 100 = 500 A (14 − 10) × 250 = 1,000 F 500 F
Usage: (SQ − AQ) × SP (110 − 100) × 70 = 700 F (260 − 250) × 14 = 140 F 840 F
Total: SQ·SP − AQ·AP 7,700 − 7,500 = 200 F 3,640 − 2,500 = 1,140 F 1,340 F
Q2: Labour variances (10,000 denims)

Actual hours: 0.50 × 10,000 = 5,000. Standard hours: 0.55 × 10,000 = 5,500.

  • Rate: (SR − AR) × AH = (10 − 12) × 5,000 = 10,000 A
  • Efficiency: (SH − AH) × SR = (5,500 − 5,000) × 10 = 5,000 F
  • Total: SH × SR − AH × AR = 55,000 − 60,000 = 5,000 A
Q3: Variable overhead variances (Araliya Sports)

Standard hours for actual output:

  • Plus: 4,500 × 2 = 9,000 direct labour hours @ 10
  • Gold: 5,200 × 1 = 5,200 machine hours @ 12

Expenditure: (actual hours × standard rate) − actual cost = (10,000 × 10 + 5,000 × 12) − 175,000 = 160,000 − 175,000 = 15,000 A

Efficiency:

  • Plus: (9,000 − 10,000) × 10 = 10,000 A
  • Gold: (5,200 − 5,000) × 12 = 2,400 F
  • Net 7,600 A

Total: standard cost 152,400 − actual 175,000 = 22,600 A (= 15,000 A + 7,600 A ✓)

Q4: Fixed overhead variances (automobiles)
  • Absorbed: 275,000 × 2,000 = Rs. 550 Mn
  • Budgeted: 250,000 × 2,000 = Rs. 500 Mn
  • Actual: Rs. 600 Mn
Variance Calculation Result
Total 550 − 600 50 Mn A
Expenditure 500 − 600 100 Mn A
Volume 550 − 500 50 Mn F
Q5: Sales variances (NHK-II fertiliser)
  • Sales price: (actual price − standard price) × actual quantity = (380 − 400) × 200 = 4,000 A
  • Sales volume (margin): (actual quantity − budgeted quantity) × standard margin = (200 − 210) × (400 − 250) = 1,500 A

9Quick revision sheet

Concept Remember it as
Standard cost Predetermined unit cost under efficient conditions
Standard costing Compare standard with actual → variances → action
Standard vs budget Per unit vs total activity (Rs 3 × 10,000 = 30,000)
Setting standards Historical records · engineering studies; BOM, purchasing, contract wage rate
Types Ideal (perfect, demotivating) · attainable (best) · current (no improvement) · basic (old)
Cost card example 20 + 72 + 24 + 18 = 134
DM price / usage AQ(AP − SP) / SP(AQ − SQ)
DL rate / efficiency AH(AR − SR) / SR(AH − SH)
VOH Expenditure: actual − AH × rate; efficiency: (AH − SH) × rate
FOH Expenditure: actual − budget; volume: (actual − budget units) × FOAR
Sales Price: (AP − SP) × actual units; volume: (actual − budget units) × standard profit or contribution
A vs F Higher cost or lower revenue = adverse
Limitations Labour focus · homogeneous output only · services · stable environment · no continuous improvement · responsibility · delay · behaviour